Description
1.5 MW G.E. Wind Turbine Controller, New never installed, More photos available.
PLEASE NOTE
- Inspections can be arranged by issuing a signed letter of intent.
- No time wasters, please
Wind Park Dismantling, or Wind Turbine Recycling required? Visit NeoCyce
Call us today on +44 77 888 66 846