Tower Foundation Cans for VESTAS V27 / V29 NEW

Brand new manufactured Tower Foundation Drums/Cans for Vestas V27/V29 for 30m, 31m and 40m towers

Make an Enquiry
SKU: 20170630 Categories: , Tag:

Description

Newly Manufactured – Certified- and proven

Vestas V27 and V29 Tower Foundation Cans

These high qualities manufactured Wind Turbine Foundation Drums/Cans are manufactured by one of our local suppliers crafted with the latest Hydraulic Tube Bending Technology and Welding Systems and assembled under strict and highest UK Manufacturing Guidelines. Turnaround delivery times only approx. 2 – 3 weeks from order.

V27 V29 Custom Foundation Drum e1593590413982 Tower Foundation Cans for VESTAS V27 / V29  NEW

  • Prices start from £5,890 GBP (Can/Drum joint with original foundation top flange ring cut and recovered from a used turbine)
  • Prices for the complete new foundation can with newly manufactured foundation flange ring fitted upon request.
  • All prices ExWks & net of VAT
  • Turn around approx. 2 – 3 weeks from date of 50% down payment received.
  • Second and last installment – 50% of the total purchase price before collection
  • Delivery Service to installation site available
  • All dimensions as per original Vestas specifications & drawings – Fully certified – All Design & Foundation Drawings for V27 or V29 for 30m, 31m and 40m towers also available upon request – Prices vary

PLEASE NOTE

  • No time wasters, please

MWPS logo new small vertical Tower Foundation Cans for VESTAS V27 / V29  NEW

Wind Park Dismantling, or Wind Turbine Recycling required? Visit NeoCyce
Have parts to sell? Sell them yourself

Call Now Icon2 transparent 1 Tower Foundation Cans for VESTAS V27 / V29  NEW

Call us today on+44 77 888 66 846

Additional information

Location

,

Show Only

,

Brand

Tower Height

,

Condition